The State Transportation Improvement Program grant will be used to help expand and improve BART's Hayward Maintenance Complex to accommodate the additional fleet, and other system and operational needs when the future BART Silicon Valley Berryessa Extension launches service, VTA officials said in a prepared statement.
The funds will pay for shop reconfigurations to maintain the BART Silicon Valley extension fleet, a component repair shop and trackwork to connect the new facilities to the existing yard track and tie-ins to the BART mainline, they said.
"The improvements … will help support the plan for future increases to the BART fleet, services and efficiencies that will be demanded by the 560,000 daily riders BART will carry in 2025; and nearly 46,000 of those trips will be generated by the new Berryessa extension and service to San Jose," said Silicon Valley Leadership Group Chief Executive Carl Guardino.
The BART Silicon Valley project involves a 16-mile extension of BART's system to San Jose, Milpitas and Santa Clara, Calif. The first phase, the Berryessa Extension, will be a 10-mile, two-station extension.
Keywords
Browse articles on California Transportation Commission on Progressive Railroading
More articles
- Amtrak service to Norfolk will provide a much-needed option for Northeast Corridor travelers, Virginia rail department says
- Class I railroads' outlook for 2013 is a smidgen on the optimistic side
- MAP-21 gives transit execs some certainty in 2013
- Rail outlook 2013; reading the rail-car order barometer (Pat Foran, Context, December 2012)
- For Norfolk Southern, a new intermodal initiative is paying off in shorter trains and efficiency gains
- Amtrak reorganization outlined during House Transportation and Infrastructure Committee hearing
- Tracy DeLeon, League of Railway Industry Women's 2012 'woman of the year,' talks career success
- Positive train control a tall order for short line railroads
- U.S. locomotive order activity has slowed, but demand for GenSets is up for some motive power manufacturers
- Rail-car deliveries to drop to 47,000 in 2013 — by Toby Kolstad
- Track inspection equipment and services update
- Domestic container volume up in 3Q, IANA says; plus, freight rail traffic data
- Railroad Contractor Case Studies (advertorial)
















