The Napoleon, Defiance & Western Railway will maintain six full-time employees in the Defiance, Ohio, area.
"We have purchased this line with the knowledge that it is in dire need of rehabilitation due to years of deferred maintenance. Our objective is to rehabilitate the line in order to provide consistent freight-rail service to all current and potential shippers utilizing the line," said Pioneer Railcorp President and Chief Executive Officer Mike Carr in a prepared statement.
The company also plans to restore two sections of track — from Napoleon to Liberty Center and west of Defiance to Cecil — to provide shippers connections to multiple Class Is.
"We are excited to service the strong customer base located on this railroad," said Carr. "Our company has a proven track record of transforming under-served short-line railroads into viable economic engines of growth through our customer focused rail transportation."
Pioneer Railcorp owns 17 short lines, as well as a railroad equipment company and contract switching services firm.
Keywords
Browse articles on Pioneer Railcorp on Progressive Railroading
More articles
- Operation Lifesaver Inc. starts new chapter with Joyce Rose at the helm
- Crude oil and intermodal will drive rail traffic for BNSF over the long term
- Metrolink's DePallo plans to build on progress, develop long-term strategy
- RailTrends 2012 represented a full deconstruction of the North American rail industry — by Tony Hatch
- CREATE update: Grade crossing upgrades, separations and closures
- TriMet's Portland-Milwaukie project will add vital link to southeast destinations
- Union Pacific opens information technology center in Austin
- Marcellus and Utica shale drilling keeps railroads busy
- Carload Express creates Ohio short line to tap two eastern shales
- Grade crossing safety: Freight and passenger railroads take a multi-pronged approach
- High-speed rail is on a slower, but steady, track: HNTB
- Material handling and distribution equipment update
- Santa Clara VTA aims for succession planning success with IT department pilot
















