The existing Lycoming Valley Railroad (LVRR) bridge was severely damaged by flood waters caused by Tropical Storm Lee in September 2011. The bridge handles all traffic to and from LVRR's hub in Williamsport. Because of the damage, the railroad has used a circuitous route to serve 30 customers, according to the FRA.
The new bridge will accommodate heavier train loads and enable LVRR to handle additional business from the emerging Marcellus Shale natural gas industry, FRA officials said in a news brief.
The Federal Emergency Management Agency has provided a $4.7 million grant and Federal Highway Administration has committed $862,612 for the project. In addition, the Pennsylvania Department of Transportation is contributing $3.5 million and SEDA-COG Joint Rail Authority (JRA) is providing $1.3 million. Lycoming County is one of eight members of the JRA, an eight-county municipal authority that owns 200 miles of track in central Pennsylvania.
Keywords
Browse articles on Federal Railroad Administration on Progressive Railroading
More articles
- Operation Lifesaver Inc. starts new chapter with Joyce Rose at the helm
- Crude oil and intermodal will drive rail traffic for BNSF over the long term
- Metrolink's DePallo plans to build on progress, develop long-term strategy
- RailTrends 2012 represented a full deconstruction of the North American rail industry — by Tony Hatch
- CREATE update: Grade crossing upgrades, separations and closures
- TriMet's Portland-Milwaukie project will add vital link to southeast destinations
- Union Pacific opens information technology center in Austin
- Marcellus and Utica shale drilling keeps railroads busy
- Carload Express creates Ohio short line to tap two eastern shales
- Grade crossing safety: Freight and passenger railroads take a multi-pronged approach
- High-speed rail is on a slower, but steady, track: HNTB
- Material handling and distribution equipment update
- Santa Clara VTA aims for succession planning success with IT department pilot
















